cancel
Showing results for 
Search instead for 
Did you mean: 
Reply
DS1
Frequent Visitor

Flow running thousands of times on SP "When an item is created or modified"

Hello, 

I am hoping for some help on why a SharePoint Flow is running thousands of times - and a way to keep the functionality of the Flow, but stop it running constantly.

I got some help on creating a Flow, here:
https://powerusers.microsoft.com/t5/Building-Flows/Want-to-use-Flow-to-copy-data-from-one-list-colum...

The Flow works great, but it is running thousands of times, as in the analytics when items are not being created or modified:
Analytics.png

The reason behind the Flow is as such:

We have a calculated column called “Week Total” 

It is desired that “Week Total” be summed, but calculated columns in SharePoint cannot be summed.
We then have a Flow that will run on create or update that takes the value from "Week Total" and puts it into another column called "Sum" that can be summed.


The Flow steps are as follows 

  1. Under Flows> Microsoft SharePoint, choose: “When an item is created or modified” so that the action is triggered whenever an item is created or modified in the list
    (choose site address and list address)
  2. Choose “Compose” and enter the WDL Expression:
    int(triggerBody()?['Period_x0020_Total'])
    This triggers the change of text to number for the “Week Total” column
  3. The next action to add is “Update Item”
    (choose site address, list address, ID field and the required “Start Date” field
  4. Under “SUM,” our desired number column that can be summed, place the “Output” from the “Composed” action earlier
  5. Save Flow and enter a value into the Time Bank List to test
    (have tested with both updating and adding new values with success)

    Here is a picture:

Flow.png

1 ACCEPTED SOLUTION

Accepted Solutions
v-xida-msft
Community Support
Community Support

Hi @DS1,

 

Could you please share a bit more about your SharePoint list?

 

I think there is something wrong with your “Update item” action, the “When an item is created or modified” trigger would be fired whenever an item is created or modified in the list. If you add an item or update existing item in your SharePoint list, the trigger would be fired and then the “Update item” action would update corresponding item in list. After that, the trigger would be fired again, because the “Update item” action has updated one item in SharePoint list. Your flow would be trapped in a infinite loop.

 

You could consider take a try to stop it running constantly with following workaround:

  • Add a “When an item is created or modified” trigger.
  • Add a Compose action, Inputs set to following formula:
int(triggerBody()?['Period_x0020_Total'])
  • Add a Condition, left input box set to dynamic SUM content, right input box set to output of “Compose” action, within middle drop down, choose is equal to.
  • Within “If/no” branch of Condition, add a “Update item” action, SUM field set to output of Compose action.

Image reference:9.JPGThe flow works successfully as below:10.JPG

 

11.JPG

 

 

Best regards,

Kris

Community Support Team _ Kris Dai
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

View solution in original post

5 REPLIES 5
v-xida-msft
Community Support
Community Support

Hi @DS1,

 

Could you please share a bit more about your SharePoint list?

 

I think there is something wrong with your “Update item” action, the “When an item is created or modified” trigger would be fired whenever an item is created or modified in the list. If you add an item or update existing item in your SharePoint list, the trigger would be fired and then the “Update item” action would update corresponding item in list. After that, the trigger would be fired again, because the “Update item” action has updated one item in SharePoint list. Your flow would be trapped in a infinite loop.

 

You could consider take a try to stop it running constantly with following workaround:

  • Add a “When an item is created or modified” trigger.
  • Add a Compose action, Inputs set to following formula:
int(triggerBody()?['Period_x0020_Total'])
  • Add a Condition, left input box set to dynamic SUM content, right input box set to output of “Compose” action, within middle drop down, choose is equal to.
  • Within “If/no” branch of Condition, add a “Update item” action, SUM field set to output of Compose action.

Image reference:9.JPGThe flow works successfully as below:10.JPG

 

11.JPG

 

 

Best regards,

Kris

Community Support Team _ Kris Dai
If this post helps, then please consider Accept it as the solution to help the other members find it more quickly.

Kris 

Thanx for the tip! I guess with your solution the Flow will be executed twice instead of entering an infinite loop, right?

 

@DS1There are several threads discussing this infinite loop effect like this one

https://powerusers.microsoft.com/t5/Building-Flows/Flow-update-to-SharePoint-list-item-fields-trigge...

 

I totally agree it is a limitation in Microsoft Flow. Let's hope Flow architects will find a solution to avoid it in the future. In the meanwhile, workarounds like the one described by @v-xida-msft are needed

 

Did I make your day? If so, mark my response as 'Solution' !!!

También escribo sobre Power Automate en este Blog y en Twitter

Thank you so much for your help! I've had a chance to try the solution (which so far is workng very well) and will have a look on Tuesday as to the analytics and number of runs.

 

Really appreciate the support from the community and also to @efialttes

Thanks again, Kris - I've checked this morning and no more looping!

kurt3000
Regular Visitor

This seems to be somewhat related to my Flow and looping.  My source data is in SQL on-prem and I'm wanting to pull all rows from SQL in to a SharePoint Online list.  I'm able to run the initial SharePoint create items action which successfully creates the items in SharePoint i'm expecting.  In my condition below, the ProjectNumber array is checking for project numbers that have been created in my SP Online list then storing those in the array.

 

CreateItems.png

 

Each month, I will also need to update existing items in my SP Online list, as there are certain fields that will change from month-to-month.  Within the same condition, if ProjectNumber in SPO matches what's in SQL, I will run an update item and only update certain fields that are expected to change month-to-month.

 

UpdateItem.png

 

As to my data, I am expecting to loop through around 1000 rows of SQL data each month then update items in my SPO list that change in SQL.  For testing, I am applying a filter so I only get 6 rows of data back.  Here's what my data looks like:

 

Rows 1-6:

ProjectNumber, Project Name, AccountingDirector, ProjectAccountaint, ActiveStatus, CurrentPeriodBillings, PercentComplete

 

All of this data is mostly unique, such as ProjectNumber, ProjectName and a few other fields

 

When I run my Flow, I get all items in the SPO list and get all items in my SQL view

I have a condition that checks if my SPO project number contains my SQL project number

If No, create item (which works great)

if Yes, update all fields in my update items screen shot

 

The problem is when the Flow runs, all projects get updated with the same data 6 times

For example:

If I have Project 1234 and all of its corresponding data for my 1st project

Project 2345 and all of its corresponding data for my 2nd project

Project 3456 and all of its corresponding data for my 3rd project

Project 4567 and all of its corresponding data for my 4th project

Project 5678 and all of its corresponding data for my 5th project

Project 6789 and all of its corresponding data for my 6th project

 

When my Flow runs, all 6 items get updated with Project 1's data the first time around.  Flow repeats this loop process all 6 times and I can see on the 2nd loop that all 6 items get updated with project 2's data, etc.  This continues until the looping completes with the number of rows that are expected to be looped through.  In the end, all 6 items finally get updated with project 6's data then the Flow completes.

 

What I want is for only project 1 to get updated with its data, project 2 with its data and so forth.

 

Is this a bug within Flow, expected behavior or just a logic issue with my Flow.  Everything I've read seems to indicate the update item portion should work as what's in my screen shot.

Helpful resources

Announcements

Community will be READ ONLY July 16th, 5p PDT -July 22nd

Dear Community Members,   We'd like to let you know of an upcoming change to the community platform: starting July 16th, the platform will transition to a READ ONLY mode until July 22nd.   During this period, members will not be able to Kudo, Comment, or Reply to any posts.   On July 22nd, please be on the lookout for a message sent to the email address registered on your community profile. This email is crucial as it will contain your unique code and link to register for the new platform encompassing all of the communities.   What to Expect in the New Community: A more unified experience where all products, including Power Apps, Power Automate, Copilot Studio, and Power Pages, will be accessible from one community.Community Blogs that you can syndicate and link to for automatic updates. We appreciate your understanding and cooperation during this transition. Stay tuned for the exciting new features and a seamless community experience ahead!

Summer of Solutions | Week 4 Results | Winners will be posted on July 24th

We are excited to announce the Summer of Solutions Challenge!    This challenge is kicking off on Monday, June 17th and will run for (4) weeks.  The challenge is open to all Power Platform (Power Apps, Power Automate, Copilot Studio & Power Pages) community members. We invite you to participate in a quest to provide solutions to as many questions as you can. Answers can be provided in all the communities.    Entry Period: This Challenge will consist of four weekly Entry Periods as follows (each an “Entry Period”)   - 12:00 a.m. PT on June 17, 2024 – 11:59 p.m. PT on June 23, 2024 - 12:00 a.m. PT on June 24, 2024 – 11:59 p.m. PT on June 30, 2024 - 12:00 a.m. PT on July 1, 2024 – 11:59 p.m. PT on July 7, 2024 - 12:00 a.m. PT on July 8, 2024 – 11:59 p.m. PT on July 14, 2024   Entries will be eligible for the Entry Period in which they are received and will not carryover to subsequent weekly entry periods.  You must enter into each weekly Entry Period separately.   How to Enter: We invite you to participate in a quest to provide "Accepted Solutions" to as many questions as you can. Answers can be provided in all the communities. Users must provide a solution which can be an “Accepted Solution” in the Forums in all of the communities and there are no limits to the number of “Accepted Solutions” that a member can provide for entries in this challenge, but each entry must be substantially unique and different.    Winner Selection and Prizes: At the end of each week, we will list the top ten (10) Community users which will consist of: 5 Community Members & 5 Super Users and they will advance to the final drawing. We will post each week in the News & Announcements the top 10 Solution providers.  At the end of the challenge, we will add all of the top 10 weekly names and enter them into a random drawing.  Then we will randomly select ten (10) winners (5 Community Members & 5 Super Users) from among all eligible entrants received across all weekly Entry Periods to receive the prize listed below. If a winner declines, we will draw again at random for the next winner.  A user will only be able to win once overall. If they are drawn multiple times, another user will be drawn at random.  Individuals will be contacted before the announcement with the opportunity to claim or deny the prize.  Once all of the winners have been notified, we will post in the News & Announcements of each community with the list of winners.   Each winner will receive one (1) Pass to the Power Platform Conference in Las Vegas, Sep. 18-20, 2024 ($1800 value). NOTE: Prize is for conference attendance only and any other costs such as airfare, lodging, transportation, and food are the sole responsibility of the winner. Tickets are not transferable to any other party or to next year’s event.   ** PLEASE SEE THE ATTACHED RULES for this CHALLENGE**   Week 1 Results: Congratulations to the Week 1 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge.   Community MembersNumber SolutionsSuper UsersNumber Solutions Deenuji 9 @NathanAlvares24  17 @Anil_g  7 @ManishSolanki  13 @eetuRobo  5 @David_MA  10 @VishnuReddy1997  5 @SpongYe  9JhonatanOB19932 (tie) @Nived_Nambiar  8 @maltie  2 (tie)   @PA-Noob  2 (tie)   @LukeMcG  2 (tie)   @tgut03  2 (tie)       Week 2 Results: Congratulations to the Week 2 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Week 2: Community MembersSolutionsSuper UsersSolutionsPower Automate  @Deenuji  12@ManishSolanki 19 @Anil_g  10 @NathanAlvares24  17 @VishnuReddy1997  6 @Expiscornovus  10 @Tjan  5 @Nived_Nambiar  10 @eetuRobo  3 @SudeepGhatakNZ 8     Week 3 Results: Congratulations to the Week 3 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Week 3:Community MembersSolutionsSuper UsersSolutionsPower Automate Deenuji32ManishSolanki55VishnuReddy199724NathanAlvares2444Anil_g22SudeepGhatakNZ40eetuRobo18Nived_Nambiar28Tjan8David_MA22   Week 4 Results: Congratulations to the Week 4 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Week 4:Community MembersSolutionsSuper UsersSolutionsPower Automate Deenuji11FLMike31Sayan11ManishSolanki16VishnuReddy199710creativeopinion14Akshansh-Sharma3SudeepGhatakNZ7claudiovc2CFernandes5 misc2Nived_Nambiar5 Usernametwice232rzaneti5 eetuRobo2   Anil_g2   SharonS2  

Check Out | 2024 Release Wave 2 Plans for Microsoft Dynamics 365 and Microsoft Power Platform

On July 16, 2024, we published the 2024 release wave 2 plans for Microsoft Dynamics 365 and Microsoft Power Platform. These plans are a compilation of the new capabilities planned to be released between October 2024 to March 2025. This release introduces a wealth of new features designed to enhance customer understanding and improve overall user experience, showcasing our dedication to driving digital transformation for our customers and partners.    The upcoming wave is centered around utilizing advanced AI and Microsoft Copilot technologies to enhance user productivity and streamline operations across diverse business applications. These enhancements include intelligent automation, AI-powered insights, and immersive user experiences that are designed to break down barriers between data, insights, and individuals. Watch a summary of the release highlights.    Discover the latest features that empower organizations to operate more efficiently and adaptively. From AI-driven sales insights and customer service enhancements to predictive analytics in supply chain management and autonomous financial processes, the new capabilities enable businesses to proactively address challenges and capitalize on opportunities.    

Updates to Transitions in the Power Platform Communities

We're embarking on a journey to enhance your experience by transitioning to a new community platform. Our team has been diligently working to create a fresh community site, leveraging the very Dynamics 365 and Power Platform tools our community advocates for.  We started this journey with transitioning Copilot Studio forums and blogs in June. The move marks the beginning of a new chapter, and we're eager for you to be a part of it. The rest of the Power Platform product sites will be moving over this summer.   Stay tuned for more updates as we get closer to the launch. We can't wait to welcome you to our new community space, designed with you in mind. Let's connect, learn, and grow together.   Here's to new beginnings and endless possibilities!   If you have any questions, observations or concerns throughout this process please go to https://aka.ms/PPCommSupport.   To stay up to date on the latest details of this migration and other important Community updates subscribe to our News and Announcements forums: Copilot Studio, Power Apps, Power Automate, Power Pages

Users online (1,837)