Holidays Condition for Formula

Hi, I have this label that will be visible if employees do not apply for Annual Leave 3 days in advance. 3 days means Monday, Tuesday, and Wednesday. The employee can apply on Thursday.

 

anonymous21_0-1660196892273.png         anonymous21_4-1660197120790.png

I set the date picker as 29 August and 31 August is a holiday so when employees apply for Annual leave, their StartDate is 29 August or 30 August or 31 August or 1 September, the label should be visible as 31 August doesn't count in the 3 days requirement. As you can see from the picture below, the label is not visible when it's 1 September while the label should only be invisible on 2 September

        anonymous21_1-1660196948657.png

These are the formulas I use.

//App.OnStart
Set(checkCondition, LookUp('Leave Policy', Title="AnnualLeave"));
Set(
    checkCondition, 
    First(
        SortByColumns(
            Filter(
                'Leave Policy', 
                Title = "AnnualLeave" && 'Effective Date' <= DatePicker1.SelectedDate
            ), 
        "EffectiveDate", Descending)
    )
);
Set(checkCondition2, checkCondition.Days);
//DataCardValue2.OnChange
//DataCardValue2 is Start Date
//DataCardValue17 is End Date
Set(
    VarDateDiff,
    RoundDown(
        DateDiff(
            DatePicker1.SelectedDate,
            DataCardValue2.SelectedDate,
            Days
        ) / 7,
        0
    ) * 5 + Mod(
        5 + Weekday(DataCardValue2.SelectedDate) - Weekday(DatePicker1.SelectedDate),
        5
    ) - CountIf(Holidays, StartDate >= DataCardValue2.SelectedDate, StartDate <= DataCardValue17.SelectedDate)
);
If(
    Weekday(DataCardValue2.SelectedDate) = 7 || Weekday(DataCardValue2.SelectedDate) = 1,
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarWeekEndError,
        true
    ),
    Set(
        VarWeekEndError,
        false
    )
);
Set(
    VarNegativeDateError,
    If(
        DatePicker1.SelectedDate > DataCardValue2.SelectedDate,
        true,
        false
    )
);
Set(
    VarAllowHoliday,
    If(
        VarDateDiff >= Value(checkCondition2),
        true,
        false
    )
);

I tried to change the VarDateDiff >= Value(CheckCondition2), into VarDate > Value(CheckCondition2). It works for holidays only but if there are no holidays then it exceeds the 3 days requirement.

 

How to fix this issue?

 

Thank you.

 

1 ACCEPTED SOLUTION

Accepted Solutions

Dear @syhrh ,

 

Could you please provide each of those 3 examples and the holidays you had in between. I can make a similar test case - this will help me figure out what is wrong.

 

I made three test cases

Lets assume today's date is 24rth august

 

  1. Start Date is 30th august and End date is 5th September. WE have a company holiday on 25th August. - Success
    • I got the error successfully
    • Anonymous_Hippo_0-1661319657474.png

       

  2. Start Date is 31st August and end date is 5th Sept. we have the same holiday fallin on 25th august. Since our difference is 3 we do not see any error now- Success
    • Screenshot 2022-08-24 004341.png
  3. Start Date is 31st August and end date is 23rd Sept. We have holidays on 25th Aug, 29 Aug, 30th Aug. Therefore holiday can be requested only on 1st sept - Success
    • Screenshot 2022-08-24 011114.png

Here make sure that you are using the correct checkcondition2 value here i am using 3 days.

i updated the formulas to catch a couple more errors

 

//StartDate OnChnage
Set(
    VarDateDiff, //This variable gives the number of days from today to start date of planned leave- excluding holidays and weekends
    RoundDown(
        DateDiff(
            Today(),
            DataCardValue2.SelectedDate,
            Days
        ) / 7,
        0
    ) * 5 + Mod(
        5 + Weekday(DataCardValue2.SelectedDate) - Weekday(Today()),
        5
    )- CountIf(Holidays, StartDate >= Today(), StartDate <= DataCardValue2.SelectedDate)// this counts the # of holidays falling inbetween Today and Start date
);
If(
    IsBlank(DataCardValue17.SelectedDate),//if End date is not set the show error
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarEndDatenotSetError,
        true
    ),
    Set(
        VarEndDatenotSetError,
        false
    )
);
If(DataCardValue2.SelectedDate >DataCardValue17.SelectedDate,Set(VarStartDateLess,true),Set(VarStartDateLess,false));
If(DataCardValue17.SelectedDate < DataCardValue2.SelectedDate,Set(VarEndDateLess,true),Set(VarEndDateLess,false));

If(
    Weekday(DataCardValue2.SelectedDate) = 7 || Weekday(DataCardValue2.SelectedDate) = 1,
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarWeekEndError,
        true
    ),
    Set(
        VarWeekEndError,
        false
    )
);
If(!IsBlank(LookUp(Holidays,DataCardValue2.SelectedDate=StartDate)) || !IsBlank(LookUp(Holidays,DataCardValue17.SelectedDate=StartDate)),Set(VarHolidayError,true),Set(VarHolidayError,false));
Set(
    VarNegativeDateError,
    If(
        Today() > DataCardValue2.SelectedDate,
        true,
        false
    )
);
Set(
    VarAllowHoliday,
    If(
        VarDateDiff >= Value(checkCondition2),
        true,
        false
    )
);

 

Error Text

If(VarEndDatenotSetError,"End date needs to be set to allow leave calculation",If(VarHolidayError,"Start Date or end Date cannot be on a holiday",If(VarEndDateLess,"End Date needs to be after Start Date",If(VarStartDateLess,"Start Date needs to be before end date", If(VarEndDatenotSetError,"End date needs to be set to allow leave calculation", If(VarWeekEndError,"Start Date cannot be on a weekend",If(VarNegativeDateError,"Start Date cannot be less than or equal to Today", If(!VarAllowHoliday,"Cannot apply for annual leave as your start date is less than " & Value(checkCondition2) &" days from today (Excluding Weekdays)"))))))))

 

Honestly this should work not sure why it is not working for you

View solution in original post

8 REPLIES 8

Hello @syhrh ,

 

Could you please explain the required logic on how  to handle holidays. lets say that Today's Date is August 15 th and I want to request vacation from 18th August but there is a holiday on 17th August. Should we only count working days when making the 3 days calculation or should we ignore the holiday in between. Thank you 🙂

Hi @Anonymous_Hippo, the 3 days calculation should only count working days so the 17 August isn't included. So you cannot apply for leave from 18 August because it doesn't meet the 3-day requirement and you can only apply on 19 August. 

Thank you.

Clear now ! @syhrh  Could you also please explain the logic of what you are trying to do with checkcondition2. also could you share a screenshot of that sharepoint list. I think the second formula is good  - the problem child is checkcondition2 

 

Thanks 

Hi @Anonymous_Hippo, the checkcondition2 is to check the days based on the Leave Policy list. In case admin wants to add another policy for the Annual Leave leave application 

anonymous21_0-1660697583517.png

 

@syhrh 

Looks like you are calculating the holidays part incorrectly . In your current formula you are considering holidays that fall in between the start date and end date only but we need to consider holidays falling in between Today and the start date only.

 

Can you try both these formula instead - both can be copy pasted directly (i have changed the names to match your variables) 

 

Start date OnChange property

 

Set(
    VarDateDiff, //This variable gives the number of days from today to start date of planned leave- excluding holidays and weekends
    RoundDown(
        DateDiff(
            Today(),
            DataCardValue2.SelectedDate,
            Days
        ) / 7,
        0
    ) * 5 + Mod(
        5 + Weekday(DataCardValue2.SelectedDate) - Weekday(Today()),
        5
    )- CountIf(Holidays, StartDate >= Today(), StartDate <= DataCardValue2.SelectedDate)// this counts the # of holidays falling inbetween Today and Start date
);
If(
    IsBlank(DataCardValue17.SelectedDate),//if Start date is not set the show error
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarStartDatenotSetError,
        true
    ),
    Set(
        VarStartDatenotSetError,
        false
    )
);
If(
    Weekday(DataCardValue2.SelectedDate) = 7 || Weekday(DataCardValue2.SelectedDate) = 1,
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarWeekEndError,
        true
    ),
    Set(
        VarWeekEndError,
        false
    )
);
Set(
    VarNegativeDateError,
    If(
        Today() > DataCardValue2.SelectedDate,
        true,
        false
    )
);
Set(
    VarAllowHoliday,
    If(
        VarDateDiff >= Value(checkCondition2),
        true,
        false
    )
);

 

 

OnStart

 

//App.OnStart
Set(checkCondition, LookUp('Leave Policy', Title="AnnualLeave"));
Set(
    checkCondition, 
    First(
        SortByColumns(
            Filter(
                'Leave Policy', 
                Title = "AnnualLeave" && 'Effective Date' <= DatePicker1.SelectedDate
            ), 
        "EffectiveDate", Descending)
    )
);
Set(checkCondition2, checkCondition.Days);

 

 

Error Text

 

If(VarStartDatenotSetError,"Start date needs to be set to allow leave calculation",If(VarWeekEndError,"Start Date cannot be on a weekend",If(VarNegativeDateError,"Start Date cannot be less than or equal to Today",If(!VarAllowHoliday,"Cannot apply for annual leave as your start date is less than "&Value(checkCondition2)&" days from today (Excluding Weekdays)"))))

 

 

Cheers !

Hi @Anonymous_Hippo,

I've tested the formula 3 times, each on a different holiday using a date picker just like you showed me in a previous post. The first test works fine for the 3-day requirement. In the second test, the label will only disappear when it's 4 days for the StartDate. In the third test, the label will only disappear when it's 6 days for the StartDate. It keeps increasing over the days. How to fix it?

 

Thank you.

Dear @syhrh ,

 

Could you please provide each of those 3 examples and the holidays you had in between. I can make a similar test case - this will help me figure out what is wrong.

 

I made three test cases

Lets assume today's date is 24rth august

 

  1. Start Date is 30th august and End date is 5th September. WE have a company holiday on 25th August. - Success
    • I got the error successfully
    • Anonymous_Hippo_0-1661319657474.png

       

  2. Start Date is 31st August and end date is 5th Sept. we have the same holiday fallin on 25th august. Since our difference is 3 we do not see any error now- Success
    • Screenshot 2022-08-24 004341.png
  3. Start Date is 31st August and end date is 23rd Sept. We have holidays on 25th Aug, 29 Aug, 30th Aug. Therefore holiday can be requested only on 1st sept - Success
    • Screenshot 2022-08-24 011114.png

Here make sure that you are using the correct checkcondition2 value here i am using 3 days.

i updated the formulas to catch a couple more errors

 

//StartDate OnChnage
Set(
    VarDateDiff, //This variable gives the number of days from today to start date of planned leave- excluding holidays and weekends
    RoundDown(
        DateDiff(
            Today(),
            DataCardValue2.SelectedDate,
            Days
        ) / 7,
        0
    ) * 5 + Mod(
        5 + Weekday(DataCardValue2.SelectedDate) - Weekday(Today()),
        5
    )- CountIf(Holidays, StartDate >= Today(), StartDate <= DataCardValue2.SelectedDate)// this counts the # of holidays falling inbetween Today and Start date
);
If(
    IsBlank(DataCardValue17.SelectedDate),//if End date is not set the show error
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarEndDatenotSetError,
        true
    ),
    Set(
        VarEndDatenotSetError,
        false
    )
);
If(DataCardValue2.SelectedDate >DataCardValue17.SelectedDate,Set(VarStartDateLess,true),Set(VarStartDateLess,false));
If(DataCardValue17.SelectedDate < DataCardValue2.SelectedDate,Set(VarEndDateLess,true),Set(VarEndDateLess,false));

If(
    Weekday(DataCardValue2.SelectedDate) = 7 || Weekday(DataCardValue2.SelectedDate) = 1,
    Set(
        VarDateDiff,
        0
    );
    Set(
        VarWeekEndError,
        true
    ),
    Set(
        VarWeekEndError,
        false
    )
);
If(!IsBlank(LookUp(Holidays,DataCardValue2.SelectedDate=StartDate)) || !IsBlank(LookUp(Holidays,DataCardValue17.SelectedDate=StartDate)),Set(VarHolidayError,true),Set(VarHolidayError,false));
Set(
    VarNegativeDateError,
    If(
        Today() > DataCardValue2.SelectedDate,
        true,
        false
    )
);
Set(
    VarAllowHoliday,
    If(
        VarDateDiff >= Value(checkCondition2),
        true,
        false
    )
);

 

Error Text

If(VarEndDatenotSetError,"End date needs to be set to allow leave calculation",If(VarHolidayError,"Start Date or end Date cannot be on a holiday",If(VarEndDateLess,"End Date needs to be after Start Date",If(VarStartDateLess,"Start Date needs to be before end date", If(VarEndDatenotSetError,"End date needs to be set to allow leave calculation", If(VarWeekEndError,"Start Date cannot be on a weekend",If(VarNegativeDateError,"Start Date cannot be less than or equal to Today", If(!VarAllowHoliday,"Cannot apply for annual leave as your start date is less than " & Value(checkCondition2) &" days from today (Excluding Weekdays)"))))))))

 

Honestly this should work not sure why it is not working for you

Hi @Anonymous_Hippo, it works! Thank you so much for your time and effort. I really appreciate it. 

Helpful resources

Announcements

Community will be READ ONLY July 16th, 5p PDT -July 22nd

Dear Community Members,   We'd like to let you know of an upcoming change to the community platform: starting July 16th, the platform will transition to a READ ONLY mode until July 22nd.   During this period, members will not be able to Kudo, Comment, or Reply to any posts.   On July 22nd, please be on the lookout for a message sent to the email address registered on your community profile. This email is crucial as it will contain your unique code and link to register for the new platform encompassing all of the communities.   What to Expect in the New Community: A more unified experience where all products, including Power Apps, Power Automate, Copilot Studio, and Power Pages, will be accessible from one community.Community Blogs that you can syndicate and link to for automatic updates. We appreciate your understanding and cooperation during this transition. Stay tuned for the exciting new features and a seamless community experience ahead!

Summer of Solutions | Week 4 Results | Winners will be posted on July 24th

We are excited to announce the Summer of Solutions Challenge!   This challenge is kicking off on Monday, June 17th and will run for (4) weeks.  The challenge is open to all Power Platform (Power Apps, Power Automate, Copilot Studio & Power Pages) community members. We invite you to participate in a quest to provide solutions in the Forums to as many questions as you can. Answers can be provided in all the communities.    Entry Period: This Challenge will consist of four weekly Entry Periods as follows (each an “Entry Period”)   - 12:00 a.m. PT on June 17, 2024 – 11:59 p.m. PT on June 23, 2024 - 12:00 a.m. PT on June 24, 2024 – 11:59 p.m. PT on June 30, 2024 - 12:00 a.m. PT on July 1, 2024 – 11:59 p.m. PT on July 7, 2024 - 12:00 a.m. PT on July 8, 2024 – 11:59 p.m. PT on July 14, 2024   Entries will be eligible for the Entry Period in which they are received and will not carryover to subsequent weekly entry periods.  You must enter into each weekly Entry Period separately.   How to Enter: We invite you to participate in a quest to provide "Accepted Solutions" to as many questions as you can. Answers can be provided in all the communities. Users must provide a solution which can be an “Accepted Solution” in the Forums in all of the communities and there are no limits to the number of “Accepted Solutions” that a member can provide for entries in this challenge, but each entry must be substantially unique and different.    Winner Selection and Prizes: At the end of each week, we will list the top ten (10) Community users which will consist of: 5 Community Members & 5 Super Users and they will advance to the final drawing. We will post each week in the News & Announcements the top 10 Solution providers.  At the end of the challenge, we will add all of the top 10 weekly names and enter them into a random drawing.  Then we will randomly select ten (10) winners (5 Community Members & 5 Super Users) from among all eligible entrants received across all weekly Entry Periods to receive the prize listed below. If a winner declines, we will draw again at random for the next winner.  A user will only be able to win once overall. If they are drawn multiple times, another user will be drawn at random.  Individuals will be contacted before the announcement with the opportunity to claim or deny the prize.  Once all of the winners have been notified, we will post in the News & Announcements of each community with the list of winners.   Each winner will receive one (1) Pass to the Power Platform Conference in Las Vegas, Sep. 18-20, 2024 ($1800 value). NOTE: Prize is for conference attendance only and any other costs such as airfare, lodging, transportation, and food are the sole responsibility of the winner. Tickets are not transferable to any other party or to next year’s event.   ** PLEASE SEE THE ATTACHED RULES for this CHALLENGE**   Week 1 Results: Congratulations to the Week 1 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Community MembersNumber of SolutionsSuper UsersNumber of Solutions @anandm08  23 @WarrenBelz  31 @DBO_DV  10 @Amik  19 AmínAA 6 @mmbr1606  12 @rzuber  4 @happyume  7 @Giraldoj  3@ANB 6 (tie)   @SpongYe  6 (tie)     Week 2 Results: Congratulations to the Week 2 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge. Community MembersSolutionsSuper UsersSolutions @anandm08  10@WarrenBelz 25 @DBO_DV  6@mmbr1606 14 @AmínAA 4 @Amik  12 @royg  3 @ANB  10 @AllanDeCastro  2 @SunilPashikanti  5 @Michaelfp  2 @FLMike  5 @eduardo_izzo  2   Meekou 2   @rzuber  2   @Velegandla  2     @PowerPlatform-P  2   @Micaiah  2     Week 3 Results: Congratulations to the Week 3 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge.   Week 3:Community MembersSolutionsSuper UsersSolutionsPower Apps anandm0861WarrenBelz86DBO_DV25Amik66Michaelfp13mmbr160647Giraldoj13FLMike31AmínAA13SpongYe27     Week 4 Results: Congratulations to the Week 4 qualifiers, you are being entered in the random drawing that will take place at the end of the challenge.   Week 4:Community MembersSolutionsSuper UsersSolutionsPower Apps DBO-DV21WarranBelz26Giraldoj7mmbr160618Muzammmil_0695067Amik14samfawzi_acml6FLMike12tzuber6ANB8   SunilPashikanti8

Check Out | 2024 Release Wave 2 Plans for Microsoft Dynamics 365 and Microsoft Power Platform

On July 16, 2024, we published the 2024 release wave 2 plans for Microsoft Dynamics 365 and Microsoft Power Platform. These plans are a compilation of the new capabilities planned to be released between October 2024 to March 2025. This release introduces a wealth of new features designed to enhance customer understanding and improve overall user experience, showcasing our dedication to driving digital transformation for our customers and partners.    The upcoming wave is centered around utilizing advanced AI and Microsoft Copilot technologies to enhance user productivity and streamline operations across diverse business applications. These enhancements include intelligent automation, AI-powered insights, and immersive user experiences that are designed to break down barriers between data, insights, and individuals. Watch a summary of the release highlights.    Discover the latest features that empower organizations to operate more efficiently and adaptively. From AI-driven sales insights and customer service enhancements to predictive analytics in supply chain management and autonomous financial processes, the new capabilities enable businesses to proactively address challenges and capitalize on opportunities.    

Updates to Transitions in the Power Platform Communities

We're embarking on a journey to enhance your experience by transitioning to a new community platform. Our team has been diligently working to create a fresh community site, leveraging the very Dynamics 365 and Power Platform tools our community advocates for.  We started this journey with transitioning Copilot Studio forums and blogs in June. The move marks the beginning of a new chapter, and we're eager for you to be a part of it. The rest of the Power Platform product sites will be moving over this summer.   Stay tuned for more updates as we get closer to the launch. We can't wait to welcome you to our new community space, designed with you in mind. Let's connect, learn, and grow together.   Here's to new beginnings and endless possibilities!   If you have any questions, observations or concerns throughout this process please go to https://aka.ms/PPCommSupport.   To stay up to date on the latest details of this migration and other important Community updates subscribe to our News and Announcements forums: Copilot Studio, Power Apps, Power Automate, Power Pages

Users online (1,711)